Project Name

High Speed Napoli - Bari, Lot Cancello – Frasso Telesino

Project Type

Railway infrastructure

Location

Province of Benevento

Client

Rete Ferroviaria Italiana S.p.A.

Construction Period

INFRASTRUCTURE  nav RAILWAY  nav  Italy, High Speed Napoli - Bari, Lot Cancello – Frasso Telesino
Italy, High Speed Napoli - Bari, Lot Cancello – Frasso Telesino

Italy, High Speed Napoli - Bari, Lot Cancello – Frasso Telesino

Design and execution of the works to double the line and increase speed on the Cancello-Frasso Telesino line, an important part of the new High Speed/High Capacity Naples - Bari line.
Part of the new rail track running from Cancello to Frasso Telesino (over 16 km, of which about 3 km of viaducts and over 4 km of natural tunnels) will run alongside the existing line, and part will take the variant for about 6 km. The maximum speed will be 200 km/h, and two new stops are also planned at Valle di Maddaloni and Dugenta- Frasso Telesino, to serve the area around Caserta and offer a direct connection to Naples, Bari and Benevento.