{"id":13899,"date":"2025-07-21T09:39:42","date_gmt":"2025-07-21T07:39:42","guid":{"rendered":"https:\/\/www.pizzarotti.it\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/"},"modified":"2025-07-21T10:31:54","modified_gmt":"2025-07-21T08:31:54","slug":"technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3","status":"publish","type":"post","link":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/","title":{"rendered":"Technical visit to the construction sites the Circumvesuviana &#8211; Doubling Torre Annunziata &#8211; Castellammare &#8211; Lots 2 and 3"},"content":{"rendered":"<p>The visit, jointly organized by the Order of Engineers of the Metropolitan City of Naples and L&#8217;Ente Autonomo Volturno (EAV), was an opportunity to illustrate the interventions related to the modernization and upgrading of the Circumvesuviana and more specifically those related to the Stabia Scavi Station, part of a larger project that includes the doubling of the section between the towns of Torre Annunziata and Castellammare di Stabia.<\/p>\n<p>The design of the new station, which is part of the works of the regional metropolitan system, will replace the one in Via Nocera and includes the construction of a new passenger building, consisting of two separate buildings connected by a connecting underpass, and an underground garage built on two levels, capable of accommodating 150 vehicles.<\/p>\n<p>For the completion of the doubling of the section, a new natural tunnel is being built under the Varano hill. This tunnel will be built according to the traditional excavation technique using metal ribs and spritz beton, after consolidation of the excavation face by jet-grouting injections and drilling with micropiles.<\/p>\n<p>The project also includes the consolidation of the slopes of Varano hill, through nailing and wire mesh put in place on the entire hillside, and hydraulic regimentation works for protection against hydrogeological phenomena, of the archaeological site of Villa Arianna.<\/p>\n<p><img decoding=\"async\" class=\"size-full wp-image-13888 aligncenter\" src=\"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri.jpg\" alt=\"\" width=\"1323\" height=\"1514\" srcset=\"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri-200x229.jpg 200w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri-262x300.jpg 262w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri-400x458.jpg 400w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri-600x687.jpg 600w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri-768x879.jpg 768w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri-800x915.jpg 800w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri-895x1024.jpg 895w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri-1200x1373.jpg 1200w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri.jpg 1323w\" sizes=\"(max-width: 1323px) 100vw, 1323px\" \/><\/p>\n<p><img decoding=\"async\" class=\"wp-image-13890 aligncenter\" src=\"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri1.jpg\" alt=\"\" width=\"1322\" height=\"992\" srcset=\"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri1-200x150.jpg 200w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri1-300x225.jpg 300w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri1-400x300.jpg 400w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri1-600x450.jpg 600w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri1-768x576.jpg 768w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri1-800x601.jpg 800w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri1-1024x769.jpg 1024w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri1-1200x901.jpg 1200w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri1-1536x1153.jpg 1536w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/2025.07.16-ordine-ingegneri1.jpg 1600w\" sizes=\"(max-width: 1322px) 100vw, 1322px\" \/><\/p>\n<p><img decoding=\"async\" class=\" wp-image-13894 aligncenter\" src=\"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/IMG-20250716-WA0033.jpg\" alt=\"\" width=\"1320\" height=\"890\" srcset=\"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/IMG-20250716-WA0033-200x135.jpg 200w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/IMG-20250716-WA0033-300x202.jpg 300w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/IMG-20250716-WA0033-400x270.jpg 400w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/IMG-20250716-WA0033-600x405.jpg 600w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/IMG-20250716-WA0033-768x518.jpg 768w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/IMG-20250716-WA0033-800x539.jpg 800w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/IMG-20250716-WA0033-1024x690.jpg 1024w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/IMG-20250716-WA0033-1200x809.jpg 1200w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/IMG-20250716-WA0033-1536x1036.jpg 1536w, https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/IMG-20250716-WA0033.jpg 1599w\" sizes=\"(max-width: 1320px) 100vw, 1320px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The visit, jointly organized by the Order of Engineers of [&hellip;]<\/p>\n","protected":false},"author":13,"featured_media":13893,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[299],"tags":[],"class_list":["post-13899","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Technical visit to the construction sites the Circumvesuviana - Doubling Torre Annunziata - Castellammare - Lots 2 and 3 - Impresa Pizzarotti &amp; C. S.p.A.<\/title>\n<meta name=\"description\" content=\"The visit, jointly organized by the Order of Engineers of the Metropolitan City of Naples and L&#039;Ente Autonomo Volturno (EAV), was an opportunity to\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Technical visit to the construction sites the Circumvesuviana - Doubling Torre Annunziata - Castellammare - Lots 2 and 3 - Impresa Pizzarotti &amp; C. S.p.A.\" \/>\n<meta property=\"og:description\" content=\"The visit, jointly organized by the Order of Engineers of the Metropolitan City of Naples and L&#039;Ente Autonomo Volturno (EAV), was an opportunity to\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/\" \/>\n<meta property=\"og:site_name\" content=\"Impresa Pizzarotti &amp; C. S.p.A.\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-21T07:39:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-21T08:31:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/Sito-web-Copertina-NEWS-94.png\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Melissa Amadei\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\\\/\"},\"author\":{\"name\":\"Melissa Amadei\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#\\\/schema\\\/person\\\/1e85602277e1a10e84243fc53b5f633b\"},\"headline\":\"Technical visit to the construction sites the Circumvesuviana &#8211; Doubling Torre Annunziata &#8211; Castellammare &#8211; Lots 2 and 3\",\"datePublished\":\"2025-07-21T07:39:42+00:00\",\"dateModified\":\"2025-07-21T08:31:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\\\/\"},\"wordCount\":231,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pizzarotti.it\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Sito-web-Copertina-NEWS-94.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\\\/\",\"url\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\\\/\",\"name\":\"Technical visit to the construction sites the Circumvesuviana - Doubling Torre Annunziata - Castellammare - Lots 2 and 3 - Impresa Pizzarotti &amp; C. S.p.A.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pizzarotti.it\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Sito-web-Copertina-NEWS-94.png\",\"datePublished\":\"2025-07-21T07:39:42+00:00\",\"dateModified\":\"2025-07-21T08:31:54+00:00\",\"description\":\"The visit, jointly organized by the Order of Engineers of the Metropolitan City of Naples and L'Ente Autonomo Volturno (EAV), was an opportunity to\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.pizzarotti.it\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Sito-web-Copertina-NEWS-94.png\",\"contentUrl\":\"https:\\\/\\\/www.pizzarotti.it\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Sito-web-Copertina-NEWS-94.png\",\"width\":600,\"height\":600},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Technical visit to the construction sites the Circumvesuviana &#8211; Doubling Torre Annunziata &#8211; Castellammare &#8211; Lots 2 and 3\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/\",\"name\":\"Impresa Pizzarotti & C. S.p.A.\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#organization\",\"name\":\"Impresa Pizzarotti & C. S.p.A.\",\"url\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.pizzarotti.it\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/pizzarotti-ipc.png\",\"contentUrl\":\"https:\\\/\\\/www.pizzarotti.it\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/pizzarotti-ipc.png\",\"width\":217,\"height\":61,\"caption\":\"Impresa Pizzarotti & C. S.p.A.\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#\\\/schema\\\/person\\\/1e85602277e1a10e84243fc53b5f633b\",\"name\":\"Melissa Amadei\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Technical visit to the construction sites the Circumvesuviana - Doubling Torre Annunziata - Castellammare - Lots 2 and 3 - Impresa Pizzarotti &amp; C. S.p.A.","description":"The visit, jointly organized by the Order of Engineers of the Metropolitan City of Naples and L'Ente Autonomo Volturno (EAV), was an opportunity to","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/","og_locale":"en_US","og_type":"article","og_title":"Technical visit to the construction sites the Circumvesuviana - Doubling Torre Annunziata - Castellammare - Lots 2 and 3 - Impresa Pizzarotti &amp; C. S.p.A.","og_description":"The visit, jointly organized by the Order of Engineers of the Metropolitan City of Naples and L'Ente Autonomo Volturno (EAV), was an opportunity to","og_url":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/","og_site_name":"Impresa Pizzarotti &amp; C. S.p.A.","article_published_time":"2025-07-21T07:39:42+00:00","article_modified_time":"2025-07-21T08:31:54+00:00","og_image":[{"width":600,"height":600,"url":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/Sito-web-Copertina-NEWS-94.png","type":"image\/png"}],"author":"Melissa Amadei","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/#article","isPartOf":{"@id":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/"},"author":{"name":"Melissa Amadei","@id":"https:\/\/www.pizzarotti.it\/en\/#\/schema\/person\/1e85602277e1a10e84243fc53b5f633b"},"headline":"Technical visit to the construction sites the Circumvesuviana &#8211; Doubling Torre Annunziata &#8211; Castellammare &#8211; Lots 2 and 3","datePublished":"2025-07-21T07:39:42+00:00","dateModified":"2025-07-21T08:31:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/"},"wordCount":231,"publisher":{"@id":"https:\/\/www.pizzarotti.it\/en\/#organization"},"image":{"@id":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/Sito-web-Copertina-NEWS-94.png","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/","url":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/","name":"Technical visit to the construction sites the Circumvesuviana - Doubling Torre Annunziata - Castellammare - Lots 2 and 3 - Impresa Pizzarotti &amp; C. S.p.A.","isPartOf":{"@id":"https:\/\/www.pizzarotti.it\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/#primaryimage"},"image":{"@id":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/Sito-web-Copertina-NEWS-94.png","datePublished":"2025-07-21T07:39:42+00:00","dateModified":"2025-07-21T08:31:54+00:00","description":"The visit, jointly organized by the Order of Engineers of the Metropolitan City of Naples and L'Ente Autonomo Volturno (EAV), was an opportunity to","breadcrumb":{"@id":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/#primaryimage","url":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/Sito-web-Copertina-NEWS-94.png","contentUrl":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/07\/Sito-web-Copertina-NEWS-94.png","width":600,"height":600},{"@type":"BreadcrumbList","@id":"https:\/\/www.pizzarotti.it\/en\/technical-visit-to-the-construction-sites-of-the-works-to-modernize-and-upgrade-the-circumvesuviana-doubling-torre-annunziata-castellammare-lots-2-and-3\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pizzarotti.it\/en\/"},{"@type":"ListItem","position":2,"name":"Technical visit to the construction sites the Circumvesuviana &#8211; Doubling Torre Annunziata &#8211; Castellammare &#8211; Lots 2 and 3"}]},{"@type":"WebSite","@id":"https:\/\/www.pizzarotti.it\/en\/#website","url":"https:\/\/www.pizzarotti.it\/en\/","name":"Impresa Pizzarotti & C. S.p.A.","description":"","publisher":{"@id":"https:\/\/www.pizzarotti.it\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pizzarotti.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pizzarotti.it\/en\/#organization","name":"Impresa Pizzarotti & C. S.p.A.","url":"https:\/\/www.pizzarotti.it\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pizzarotti.it\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2023\/09\/pizzarotti-ipc.png","contentUrl":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2023\/09\/pizzarotti-ipc.png","width":217,"height":61,"caption":"Impresa Pizzarotti & C. S.p.A."},"image":{"@id":"https:\/\/www.pizzarotti.it\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.pizzarotti.it\/en\/#\/schema\/person\/1e85602277e1a10e84243fc53b5f633b","name":"Melissa Amadei"}]}},"_links":{"self":[{"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/posts\/13899","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/comments?post=13899"}],"version-history":[{"count":1,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/posts\/13899\/revisions"}],"predecessor-version":[{"id":13901,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/posts\/13899\/revisions\/13901"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/media\/13893"}],"wp:attachment":[{"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/media?parent=13899"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/categories?post=13899"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/tags?post=13899"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}