{"id":11536,"date":"2025-01-14T12:15:20","date_gmt":"2025-01-14T11:15:20","guid":{"rendered":"https:\/\/www.pizzarotti.it\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/"},"modified":"2025-01-14T12:19:54","modified_gmt":"2025-01-14T11:19:54","slug":"hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation","status":"publish","type":"post","link":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/","title":{"rendered":"HS\/HC Naples-Bari: Precast Area dedicated to precasting concrete segments entered full operation"},"content":{"rendered":"<p>At the Bovino construction site, where work continues successfully on the Naples-Bari HS\/HC, the Precast Area dedicated to the prefabrication of concrete segments has become fully operational, marking another important milestone for Impresa Pizzarotti &amp; C. S.p.A.<\/p>\n<p>Thanks to an integrated concrete batching and storage plant, optimized for logistics and production, two segments for tunnel lining are made every seven minutes. This makes it possible to reach an extraordinary production volume: one million cubic meters of ashlars to serve the six TBMs used in the construction of the Orsara tunnel and the Hirpinia tunnel (the latter, with its 27 km, will be the longest tunnel in Italy on a par with the Valico tunnel on the Genoa-Tortona).<\/p>\n<p>The decision to produce the ashlars directly \u201cin house\u201d is a strength of the project: this approach significantly reduces environmental impact, limiting CO\u2082 emissions, heavy traffic on local roads, and noise pollution. Once again Pizzarotti stands out for its integration of technological innovation, sustainability and efficient resource management. A key feature of the plant, robotics in action. The 4 operating robots, perform 4 different types of functions, simultaneous unscrewing and brushing, screwing and disarming spraying. The whole robotic cycle aims to improve all wearing and dangerous activities by going to improve the quality, safety and efficiency of work.<\/p>\n<p>The work on the Orsara tunnel and the Naples-Bari HS\/HC line testifies to the commitment and strategic vision of Impresa Pizzarotti: this project stands out not only for the engineering solutions adopted but also for its attention to the environment and the enhancement of local resources. The steady progress in the construction of this symbolic work for the future of Southern Italy confirms a commitment to faster, more efficient and territory-friendly rail links, marking a fundamental step in the infrastructural and social development of the entire country.<\/p>\n<div style=\"width: 1360px;\" class=\"wp-video\"><video class=\"wp-video-shortcode\" id=\"video-11536-1\" width=\"1360\" height=\"765\" preload=\"auto\" controls=\"controls\"><source type=\"video\/mp4\" src=\"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/01\/Precast-2.mp4?_=1\" \/><a href=\"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/01\/Precast-2.mp4\">https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/01\/Precast-2.mp4<\/a><\/video><\/div>\n","protected":false},"excerpt":{"rendered":"<p>At the Bovino construction site, where work continues successfully on [&hellip;]<\/p>\n","protected":false},"author":13,"featured_media":11539,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[299],"tags":[],"class_list":["post-11536","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>HS\/HC Naples-Bari: Precast Area dedicated to precasting concrete segments entered full operation - Impresa Pizzarotti &amp; C. S.p.A.<\/title>\n<meta name=\"description\" content=\"At the Bovino construction site, where work continues successfully on the Naples-Bari HS\/HC, the Precast Area dedicated to the prefabrication of concrete\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"HS\/HC Naples-Bari: Precast Area dedicated to precasting concrete segments entered full operation - Impresa Pizzarotti &amp; C. S.p.A.\" \/>\n<meta property=\"og:description\" content=\"At the Bovino construction site, where work continues successfully on the Naples-Bari HS\/HC, the Precast Area dedicated to the prefabrication of concrete\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/\" \/>\n<meta property=\"og:site_name\" content=\"Impresa Pizzarotti &amp; C. S.p.A.\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-14T11:15:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-14T11:19:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/01\/Sito-web-Copertina-NEWS.png\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Melissa Amadei\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\\\/\"},\"author\":{\"name\":\"Melissa Amadei\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#\\\/schema\\\/person\\\/1e85602277e1a10e84243fc53b5f633b\"},\"headline\":\"HS\\\/HC Naples-Bari: Precast Area dedicated to precasting concrete segments entered full operation\",\"datePublished\":\"2025-01-14T11:15:20+00:00\",\"dateModified\":\"2025-01-14T11:19:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\\\/\"},\"wordCount\":331,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pizzarotti.it\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Sito-web-Copertina-NEWS.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\\\/\",\"url\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\\\/\",\"name\":\"HS\\\/HC Naples-Bari: Precast Area dedicated to precasting concrete segments entered full operation - Impresa Pizzarotti &amp; C. S.p.A.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pizzarotti.it\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Sito-web-Copertina-NEWS.png\",\"datePublished\":\"2025-01-14T11:15:20+00:00\",\"dateModified\":\"2025-01-14T11:19:54+00:00\",\"description\":\"At the Bovino construction site, where work continues successfully on the Naples-Bari HS\\\/HC, the Precast Area dedicated to the prefabrication of concrete\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.pizzarotti.it\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Sito-web-Copertina-NEWS.png\",\"contentUrl\":\"https:\\\/\\\/www.pizzarotti.it\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Sito-web-Copertina-NEWS.png\",\"width\":600,\"height\":600},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"HS\\\/HC Naples-Bari: Precast Area dedicated to precasting concrete segments entered full operation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/\",\"name\":\"Impresa Pizzarotti & C. S.p.A.\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#organization\",\"name\":\"Impresa Pizzarotti & C. S.p.A.\",\"url\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.pizzarotti.it\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/pizzarotti-ipc.png\",\"contentUrl\":\"https:\\\/\\\/www.pizzarotti.it\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/pizzarotti-ipc.png\",\"width\":217,\"height\":61,\"caption\":\"Impresa Pizzarotti & C. S.p.A.\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.pizzarotti.it\\\/en\\\/#\\\/schema\\\/person\\\/1e85602277e1a10e84243fc53b5f633b\",\"name\":\"Melissa Amadei\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"HS\/HC Naples-Bari: Precast Area dedicated to precasting concrete segments entered full operation - Impresa Pizzarotti &amp; C. S.p.A.","description":"At the Bovino construction site, where work continues successfully on the Naples-Bari HS\/HC, the Precast Area dedicated to the prefabrication of concrete","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/","og_locale":"en_US","og_type":"article","og_title":"HS\/HC Naples-Bari: Precast Area dedicated to precasting concrete segments entered full operation - Impresa Pizzarotti &amp; C. S.p.A.","og_description":"At the Bovino construction site, where work continues successfully on the Naples-Bari HS\/HC, the Precast Area dedicated to the prefabrication of concrete","og_url":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/","og_site_name":"Impresa Pizzarotti &amp; C. S.p.A.","article_published_time":"2025-01-14T11:15:20+00:00","article_modified_time":"2025-01-14T11:19:54+00:00","og_image":[{"width":600,"height":600,"url":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/01\/Sito-web-Copertina-NEWS.png","type":"image\/png"}],"author":"Melissa Amadei","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/#article","isPartOf":{"@id":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/"},"author":{"name":"Melissa Amadei","@id":"https:\/\/www.pizzarotti.it\/en\/#\/schema\/person\/1e85602277e1a10e84243fc53b5f633b"},"headline":"HS\/HC Naples-Bari: Precast Area dedicated to precasting concrete segments entered full operation","datePublished":"2025-01-14T11:15:20+00:00","dateModified":"2025-01-14T11:19:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/"},"wordCount":331,"publisher":{"@id":"https:\/\/www.pizzarotti.it\/en\/#organization"},"image":{"@id":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/01\/Sito-web-Copertina-NEWS.png","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/","url":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/","name":"HS\/HC Naples-Bari: Precast Area dedicated to precasting concrete segments entered full operation - Impresa Pizzarotti &amp; C. S.p.A.","isPartOf":{"@id":"https:\/\/www.pizzarotti.it\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/#primaryimage"},"image":{"@id":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/01\/Sito-web-Copertina-NEWS.png","datePublished":"2025-01-14T11:15:20+00:00","dateModified":"2025-01-14T11:19:54+00:00","description":"At the Bovino construction site, where work continues successfully on the Naples-Bari HS\/HC, the Precast Area dedicated to the prefabrication of concrete","breadcrumb":{"@id":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/#primaryimage","url":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/01\/Sito-web-Copertina-NEWS.png","contentUrl":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2025\/01\/Sito-web-Copertina-NEWS.png","width":600,"height":600},{"@type":"BreadcrumbList","@id":"https:\/\/www.pizzarotti.it\/en\/hs-hc-naples-bari-precast-area-dedicated-to-precasting-concrete-segments-entered-full-operation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pizzarotti.it\/en\/"},{"@type":"ListItem","position":2,"name":"HS\/HC Naples-Bari: Precast Area dedicated to precasting concrete segments entered full operation"}]},{"@type":"WebSite","@id":"https:\/\/www.pizzarotti.it\/en\/#website","url":"https:\/\/www.pizzarotti.it\/en\/","name":"Impresa Pizzarotti & C. S.p.A.","description":"","publisher":{"@id":"https:\/\/www.pizzarotti.it\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pizzarotti.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pizzarotti.it\/en\/#organization","name":"Impresa Pizzarotti & C. S.p.A.","url":"https:\/\/www.pizzarotti.it\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pizzarotti.it\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2023\/09\/pizzarotti-ipc.png","contentUrl":"https:\/\/www.pizzarotti.it\/wp-content\/uploads\/2023\/09\/pizzarotti-ipc.png","width":217,"height":61,"caption":"Impresa Pizzarotti & C. S.p.A."},"image":{"@id":"https:\/\/www.pizzarotti.it\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.pizzarotti.it\/en\/#\/schema\/person\/1e85602277e1a10e84243fc53b5f633b","name":"Melissa Amadei"}]}},"_links":{"self":[{"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/posts\/11536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/comments?post=11536"}],"version-history":[{"count":1,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/posts\/11536\/revisions"}],"predecessor-version":[{"id":11537,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/posts\/11536\/revisions\/11537"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/media\/11539"}],"wp:attachment":[{"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/media?parent=11536"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/categories?post=11536"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pizzarotti.it\/en\/wp-json\/wp\/v2\/tags?post=11536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}