Project
overview
Business area
Infrastructures
Category
Road / Highway
Status
In progress
Executive design and execution of works related to the section of the Pedemontana Lombarda freeway between the interconnection Ex S.S. 35 and A51, the Dalmine – Como – Varese – Valico del Gaggiolo freeway link and related works. The work is divided into 2 sections for a total length of 26.2 km; section B2 with a length of about 9.6 km, including 4 interchanges, section C with a length of about 16.6 km, in which there are 4 interchanges.