Project
overview

Business area

Infrastructures

Category

Industrial

Status

Completed

The terminated project features: two concrete gravity dams, 55m high each with ancillary works, a connection tunnel between the two reservoirs, a pressure-system transfer tunnel, a hydro-electric power plant located in a cave powered by dual 75-MW turbines, a discharge tunnel and approach roads for nearly 70 km