Executive design and construction of the works of the Battipaglia-Romagnano functional section, part of the new Salerno-Reggio Calabria high-speed line.

The works consist of the construction of a new 35 kilometer HS standard line between Battipaglia and Romagnano, where a crossroads is planned to guarantee interconnection with the existing line that goes from Battipaglia to Potenza and Metaponto. The project, the first section of the new Salerno-Reggio Calabria high-speed line, involves the construction of 18 km of tunnels and viaducts for a total length of approximately 6 km.

The completion of the new Salerno-Reggio Calabria railway line, an integral part of the “Scandinavia – Mediterranean” Ten-t network corridor that connects Palermo to Helsinki, will allow the development of new passenger and freight traffic along the north-south axis of the peninsula, accelerating dynamics of economic, social and tourist growth.