04 September 2026

Pizzarotti Prefabbricati creates a new building for the Scatolificio Viola

The Scatolificio Viola has once again chosen Impresa Pizzarotti & amp; C. SpA for the construction of its next building which will bring the industrial complex to a total of 6,000 m2. Construction site operations are scheduled to begin between late 2026 and early 2027.

It all started exactly twenty years ago, in 2007, when the first building of approximately 4,000 m2 was built. Every detail was studied and created with the utmost care: from the 30-meter spans with Pitti tile system and CA slabs. R120′, up to the refined finishes of the Carrara white and Verona red terrazzo panels with false joints and window compartments with rounded corners.

This intervention, to complete the lot created in 2007, confirms the continuity of Pizzarotti Prefabbricati in the Florentine industrial fabric and our reliability over time.

Another demonstration of how the quality of our products and the solidity of relationships know how to last over the years overcoming the inevitable alternation of generations.