09 February 2024

Peru, La Joya Bridge: work on the bridge in the city of Arequipa continues and the assembly of the metal structure is being completed

It’s scheduled for the beginning of March, the beginning of the works for the construction of the superstructure.

The bridge, will be composed of a steel arch structure and will have a total length of 371m of which 175 m related to the extension of the arc. The road platform will consist of 4 lanes on which it is estimated
a transit of 2500 vehicles per day.

To see the full video, visit the LinkedIn page