09 December 2024

Major advances for the Grand Paris Express Ligne17-1 construction site

Impresa Pizzarotti together with partners from the Avenir consortium have delivered the second section of the approximately 2.5 km-long metro tunnel built between the towns of Bonneuil-en-France and Triangle de Gonesse, the tunnel exit trench, and the Triangle de Gonesse station slab for a total handover in the near future.

Impresa Pizzarotti is deeply proud to participate in this project that enables the development of sustainable transport.