Purification plants management

Naples

From project to management

purification plants of North Naples and West Naples/Cuma, built around the 1980s, our commitment to the management of the plants and the network of district collectors continues. The plants extend over an area of 67 hectares in total and serve a district of approximately 2 million inhabitants in total, with an average flow rate of 115,000 cubic meters per day for North Naples and 230,000 cubic meters per day for the Cuma plant.

OBJECTIVE OF REDUCING ENVIRONMENTAL IMPACT

  • Protection of the coastline thanks to an effluent with concentrations of pollutants 2.5 times lower than the legal limits
  • Strong reduction of chemical products from the water purification cycle
  • Reduction of odor emissions with the installation of new deodorizers
  • Sludge recovery with biogas production from digesters and electricity production
  • Reduction of energy consumption with cogeneration
  • Heat recovery from cogenerator exhaust fumes
  • Reduction of drained sludge with drying
  • Improved health and environment
  • Adaptation to current regulations on workers safety.
CUMANORTH NAPLES
Approximately 30 subcontractors for maintenance and works
140 workers + 30 technicians involved in maintenance and works60 workers + 15 technicians involved in maintenance and works
10 regional officials for control and verification operations7 regional officials for control and verification operations
Maximum attention to aspects relating to safety. ZERO INJURIES